Today is
Quick Links
RGB Global In Public |
MONTREAL, Canada, CLEVELAND, Ohio and MUNICH, Germany, March 1, 2005- Polyplan Technologies announced a distribution agreement with Siemens Group Industrial Solutions and Services (I&S) to integrate Polyplan’s cMPM solution into its manufacturing execution systems (MES) portfolio to better serve global clients looking to close the information gap between design and manufacturing. By integrating CAD/PDM with ERP over Polyplan’s cMPM solution, Siemens I&S will be able to streamline the design-to-production process for complex engineered-to-order manufacturers.
The Polyplan cMPM solution provides leading manufacturers of complex engineered-to-order products with a 3D-centric manufacturing process design workbench that seamlessly bridges the gap between manufacturing and engineering systems. The solution fosters concurrent engineering and real-time collaboration between manufacturing process design and product design, systematically driving the manufacturability of product designs, assessing and controlling the impact of changes down to the shop floor, and reducing production ramp-up time and costs.
Siemens I&S, a worldwide solution and service provider for industry, will use the Polyplan cMPM solution to improve the infrastructure and competitiveness of its customers.
“Partnering with Polyplan Technologies gives us the technology we need for significant leaps in efficiency in a totally seamless environment,” said Vlado Radoš, Director Business Development of Siemens’s MES Manufacturing Industries. Siemens will deliver on all aspects of the cMPM solution, from marketing, communications and pre-sale activities, to implementation, training, advanced configuration and technical support.
“We are pleased to enter into this relationship with Siemens I&S, which has an outstanding global network of sales and support offices,” said Robert Beauchemin, CEO of Polyplan Technologies. “We look forward to strengthening our relationship with Siemens and benefiting from their vast experience as a solutions integrator to further develop the Polyplan cMPM solution.”
SOURCE: Polyplan Technologies, Inc. Copyright© 2005 Polyplan Technologies Inc. All rights reserved.
© 2002-2010 - RGB Global Management Consulting
All rights reserved
Published at 20:02
11 March 2011